JalaRakshak AIby quaStrat

Shift Brief

Demo North Pumping Station · frozen as of 2026-10-12 · condition index is an explainable demonstration index, not a probability of failure.

Key findings

  • P-102Wire-to-water efficiency 0.7121 → 0.5674 (20.32% deterioration). Cause unverified. Evidence →
  • V-201Last stroke test: failed. Operability finding requires engineering review. Evidence →
  • P-104INSUFFICIENT EVIDENCE — no valid run data. Not healthy, not low risk: test required. Evidence →
  • P-103Recent median vibration 6.44 mm/s (watch ≥ 4.5). Bearing fault not confirmed. Evidence →

Next best inspection

A-11 · Test standby pump

P-104 · uncertainty 0.9 · information value 40 pts

₹11,000 · 3 crew h · no outage

Record a finding

Current optimal plan

A-01, A-06, A-08, A-10, A-11

₹98,500 · composite 107.940

Open planner →

All assets (8)