Next Best Inspection
Inspections buy information; they do not physically reduce failure risk. Verified findings open evidence gates for repairs.
Ranked inspections by information value
A-11 Test standby pump
INSUFFICIENT EVIDENCEP-104 · uncertainty 0.90 · info 40 pts · ₹11,000
A-01 Inspect suction / strainer
Index 58.0P-102 · uncertainty 0.05 · info 38 pts · ₹12,000
A-08 Stroke-test valve
Index 12.0V-202 · uncertainty 0.38 · info 28 pts · ₹8,000
A-04 Inspect vibration / bearings
Index 44.0P-103 · uncertainty 0.05 · info 25 pts · ₹14,500
A-10 Thermographic inspection
Index 10.0MCC-401 · uncertainty 0.15 · info 16 pts · ₹9,500
A-07 Recheck valve operability
Index 78.0V-201 · uncertainty 0.10 · info 11 pts · ₹9,000
A-13 Routine check
Index 12.1P-101 · uncertainty 0.05 · info 4 pts · ₹6,500
| Action | Asset | Condition | Uncertainty | Info pts | Cost |
|---|---|---|---|---|---|
| A-11 Test standby pump | P-104 | INSUFFICIENT EVIDENCE | 0.90 | 40 | ₹11,000 |
| A-01 Inspect suction / strainer | P-102 | Index 58.0 | 0.05 | 38 | ₹12,000 |
| A-08 Stroke-test valve | V-202 | Index 12.0 | 0.38 | 28 | ₹8,000 |
| A-04 Inspect vibration / bearings | P-103 | Index 44.0 | 0.05 | 25 | ₹14,500 |
| A-10 Thermographic inspection | MCC-401 | Index 10.0 | 0.15 | 16 | ₹9,500 |
| A-07 Recheck valve operability | V-201 | Index 78.0 | 0.10 | 11 | ₹9,000 |
| A-13 Routine check | P-101 | Index 12.1 | 0.05 | 4 | ₹6,500 |
Record verified field finding
Demo scenarios
Verified findings (0)
None active. Seed state only.
View full findings backlog →Evidence gates
- A-02 Impeller overhaul (P-102 needs impeller_damage)blocked
- A-03 Clean obstructed strainer (P-102 needs strainer_blocked)blocked
- A-05 Replace bearings (P-103 needs bearing_damage)blocked
- A-12 Correct failed standby start (P-104 needs failed_standby_test)blocked
Want a plain-language explanation of an inspection plan? Open AI Plan Explainer →
Audit log
No events yet.