JalaRakshak AIby quaStrat

P-104 · Pump Train 4

Pump train · standby · criticality 5/5 · commissioned 2012 · source GIS-P-104

Condition index vs confidence

INSUFFICIENT EVIDENCE

Condition index (0–100)

null

Evidence confidence

0.10

Index is an explainable demonstration score, not a probability of failure.

Plain-English explanation

P-104 has INSUFFICIENT EVIDENCE. No condition index is computed; this asset must not be treated as healthy or low risk. A targeted test is recommended.

  • No valid recent operating telemetry; do not infer that standby equipment is healthy or failing
  • Standby function test is overdue; targeted operability test recommended
  • Inspection overdue by 43 days; this affects inspection priority, not proof of physical failure

No telemetry readings exist for this asset in the synthetic seed.

Inspection evidence

  • INSP-003 · 2026-07-02
    standby run test: deferred (insufficient_evidence) — No reliable latest performance evidence verified

Maintenance history

No work orders.

Engineer review